No Products in the Cart
01 8555 000
Surface must be free of grease, oil and dirt. Unscrew the nozzle and cut opening large enough to ensure the product can be properly dispensed. Apply liberally to one side of the surface being bonded and apply firm pressure continuously for a minimum of 10-30 seconds for instant grab to take hold.
Allow 24-48 hours for curing. Will reach maximum strength in 7 days